What we did:
- Put together booth
- Got more PVC pipes
- Made structure more stable
- Bumper connections
- Made fit
- Broke tools
- Tap and screwdriver
- Drilled holes into encoder mount
- Retap encoder mount
Mechanical:
Attendance: ZJ, Kevin, Sara, Danielle
- Made red pipes for booth. Also planned out booth design and fixed battery bot
- Weld according to the cad design
- Leave a lot of spare space
- More tolerance
- .25 on each side
No comments:
Post a Comment